
This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit www.volts.wtf/subscribeAre data centers raising everyone else’s electricity rates? The extremely unsatisfying answer is, it depends. A new report puts numbers on it: depending on circumstances, a large new load can cut other customers’ rates as much as 6 percent or raise them as much as 9 percent. The good news is that most of what makes the difference is under regulators’ control. I talk with authors Long Lam and Natalie Northrup about the tools available, from minimum bills to “bring your own power.”Chapters:00:00 – Introduction02:28 – Long Lam's background and the Berkeley Lab rates study05:33 – Two intuitions, and how the model works08:16 – Flexible data centers and how much grids trust them11:35 – Factor one: spare capacity on the grid16:47 – Who should get the spare capacity?18:44 – Factor two: whether the load shows up23:20 – Is capacity built for no-show loads wasted?29:42 – Factor three: what kind of grid you're on32:42 – Regional markets share costs and risks36:46 – Minimum bills and collateral41:53 – When data centers bring their own power48:29 – Charging data centers twice55:23 – Prioritizing spare capacity: Denmark, BC and auctions1:00:59 – Growing the grid vs. lowering rates1:02:59 – Tools for ratepayers and state policymakers
Podzilla Summary coming soon
Sign up to get notified when the full AI-powered summary is ready.
Free forever for up to 3 podcasts. No credit card required.

Can a developer turn data centers’ reputation around?

“Repowering” worn out solar fields could create gigawatts of new grid capacity, quickly

The federal permitting bill has been updated. What changed?

So, how about those midterm elections?
Free AI-powered recaps of Volts and your other favorite podcasts, delivered to your inbox.
Free forever for up to 3 podcasts. No credit card required.