
Most of us measure capacity by how many projects we're running. I did it too, and it's the wrong metric entirely. In this episode, I'm breaking down the two variables that actually determine how a project feels to manage: who's running the operational machine, and how compressed the timeline is. I walk through my own current roster, including the mid-sized renovation that honestly wrecked me these past couple of months despite being the smallest project on my plate, to show you exactly how this plays out in real life. If you've ever felt buried on something that looked manageable on paper, or wondered why your fee never quite catches up to what you're actually carrying, this one is for you. You'll learn: Why project count tells you almost nothing about your real workload The two questions to ask before saying yes to any new project How to price the actual load — not just the square footage Mentioned in this episode: Join The Designer's Edge waitlist here: https://www.reneedevignierdesign.com/construction-management-interior-designers Grab Your Free Script Guide here: https://www.reneedevignierdesign.com/push-back-script-handout Access the full video interview with Elana Steele of Steele Appliance here: https://www.reneedevignierdesign.com/appliance Find the full shownotes at: https://devignierdesign.com/interior-designer-capacity-project-count
Podzilla Summary coming soon
Sign up to get notified when the full AI-powered summary is ready.
Free forever for up to 3 podcasts. No credit card required.

290. How to Find a Contractor (Before You Desperately Need One)

289. What AI Can't Replace in Interior Design (And Why Construction Management Is Your Biggest Advantage)

288. A Listener Favorite: The Business of Design & The Power of Process | Katie Decker-Erickson

287. What Interior Designers Get Wrong About the People Who Build Their Projects
Free AI-powered recaps of Only Girl On The Jobsite and your other favorite podcasts, delivered to your inbox.
Free forever for up to 3 podcasts. No credit card required.