
An unprecedented 92.2-gigawatt summer peak demand forecast in ERCOT is violently colliding with severe physical capacity limits and unmodeled regulatory threats across the bulk power system. This briefing examines ERCOT's "Batch Zero" proposal to triage a 410-gigawatt queue, PJM's deliverability constraints driving NextEra's $67 billion buyout of Dominion Energy, and a fierce FCC rulemaking battle over 900 MHz spectrum interference that threatens critical SCADA telemetry networks. Utility professionals and regulatory analysts must actively recalibrate their resource adequacy models and capital deployment strategies to navigate massive stranded transmission costs and a potential $100 billion telemetry compliance mandate. Current Events: The Electric Utility Today provides clinical, data-driven intelligence for professionals navigating the operational limits of the bulk power system.
Podzilla Summary coming soon
Sign up to get notified when the full AI-powered summary is ready.
Free forever for up to 3 podcasts. No credit card required.

2026.07.28 | DOE Section 202(c) SPP Order & PJM’s 3GW Data Center Drop

2026.07.21 | FERC’s Computational Load Entity & PJM’s 168GW Peak

2026.07.14 | New Jersey’s Fair Share Act & FERC's Computational Load Rules

2026.07.07 | DOE Section 202(c) Emergency Orders & PJM’s $12K LMP Spike
Free AI-powered recaps of Current Events - The Electric Utility Today and your other favorite podcasts, delivered to your inbox.
Free forever for up to 3 podcasts. No credit card required.